Jiangsu Sankon Building Materials Technology Co., Ltd.

Jiangsu Sankon Building Materials Technology Co., Ltd.

Manufacturer from China
Active Member
5 Years
Home / Products / AAC Block Machine /

OEM ISO9001 Two Beams Hoist AAC Block Machine

Contact Now
Jiangsu Sankon Building Materials Technology Co., Ltd.
City:changzhou
Province/State:jiangsu
Country/Region:china
Contact Person:MsRita
Contact Now

OEM ISO9001 Two Beams Hoist AAC Block Machine

Ask Latest Price
Brand Name :SANKON
Model Number :CUSTOMIZED
Certification :ISO9001/CE
Place of Origin :CHINA
MOQ :1SET
Price :USD1~200000
Payment Terms :L/C, T/T
Supply Ability :1200SETS/YEAR
Delivery Time :3MONTHS
Packaging Details :SUIT FOR SHIPPING
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Hoist of finished concrete

Application

The hoist (Refer to the picture) is the back-up equipment for autoclaved aerated concrete cutting machine. It is installed on the automatic billet shift machine and the lifting is controlled by the guide frame. It is an ideal choice for finished concrete transportation, featured of stability, positioning-accuracy and no sway.

OEM ISO9001 Two Beams Hoist AAC Block Machine

Structure

The clamp is composed of a horizon beam, a vertical beam, a guide frame, a guide device, clamp device, a lifting unit and cylinder system. The two beams are made of huge steel pipes, so it is featured of good stiffness, compact structure and it can be easily installed and debug. Lifting device is located on the horizon beam and the guide unit is fixed on the vertical beam.

Working principle

The clamp can be moved, lifted, clamped and released.

move

It can be moved axially.

Lifting

It will move along the guiding frame and then the hoist will go up and down.

Clamp and release

The hydraulic station supplies oil to the cylinder to make the clamping device rotate, the cylinder contracts to clamp, and elongate to release.

When the cylinder contracts and is in a clamped state, the spreader is lifted, so the finished product can be lifted.

Maintenance and repair

Maintenance

Pleas make sure that the cylinder system is maintained according to its operation manual.

Please remove the dust on the piston rod after work with cotton cloths and make sure it is reset.

To clean up the clamp unit, lifting device, guide unit and make sure that there is no waste left.

Repair

Please check all fasteners to avoid any possible loose and change worn parts.

Inquiry Cart 0