Jiangsu Sankon Building Materials Technology Co., Ltd.

Jiangsu Sankon Building Materials Technology Co., Ltd.

Manufacturer from China
Active Member
5 Years
Home / Products / Autoclaved Aerated Concrete Production Line /

Automatic Aerated Concrete Block Making Machine - Grouping Crane-Autoclaved Aerated Concrete Production

Contact Now
Jiangsu Sankon Building Materials Technology Co., Ltd.
City:changzhou
Province/State:jiangsu
Country/Region:china
Contact Person:MsRita
Contact Now

Automatic Aerated Concrete Block Making Machine - Grouping Crane-Autoclaved Aerated Concrete Production

Ask Latest Price
Video Channel
Brand Name :SANKON
Model Number :CUSTOMIZED
Certification :ISO9001/CE
Place of Origin :CHINA
MOQ :1SET
Price :USD1~25000/SET
Payment Terms :L/C, T/T
Supply Ability :1200SETS/YEAR
Delivery Time :3MONTHS
Packaging Details :SUIT FOR SHIPPING
Name :Grouping Crane
Rated voltage :380V
Type :Customized
Certificate :ISO9001/CE
Material :stainless steel, Iron+paint
Application :Machinery & Hardware
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Application:

The sling (see the picture) is a match equipment for autoclaved aerated concrete cutting machine. It is installed on the automatic billet shift machine, the lifting is controlled by the guide frame. It is a special tool to move the de-skin billet to the autoclave.

Automatic Aerated Concrete Block Making Machine - Grouping Crane-Autoclaved Aerated Concrete Production

Technical parameter:

1.Maximum Size (Maximum)(including guide frame)

L:6440mm W:1700mm H:4810mm

2.Weight:3800㎏

Structure:

The sling is composed of a horizon beam, a vertical beam, a guide frame and a lifting unit.

The two beams are made of huge steel pipes, so it is featured of good stiffness, compact structure and it can be easily installed and debug.

Lifting device is located on the horizon beam and the guide unit is fixed on the vertical beam.

Working principle:

When the over-head hanger rope is lifted by the pulley wheel lifts, the guide unit will move along the frame and then the sling will go up and down.

Assembly:

Following procedure should be performed

1. to combine the horizon beam and upright beam t together.

2.To connect the guide frame to the automatic billet shift machine.

3. to combine guide device and its frame together.

4.To assemble the lifting device and guide frame together.

Pilot running and debugging:

1.Pilot running

The sling can go up and down smoothly and stably, without any abnormalities, no jamming and no swaying.

2. Debugging

a.If the horizon beam is not critical to the upstanding beam, a pad is needed.

b.The gap between the wheel and frame may be proper if it is swaying.

Maintenance and repair:

1.Maintenance

a.Please remove the dust on the piston rod after work with cotton cloths and make sure it is reset.

b.To clean up the lifting device, guide unit without any waste left.

2.Repair

Please check all fasteners to avoid any possible loose and change worn parts.

After-sales service:
1.Provide engineers abroad installation and commissioning service.
2.Held online or site training for workers to ensure the safe operation.

3.Our expert will answer any inquiry within 24-48 hours and it will be solved as soon as possible.

4.We supplies the complete technical documents and the relative drawings of the electric components which were written in Chinese and English.

5.Service is available lifelong.

Automatic Aerated Concrete Block Making Machine - Grouping Crane-Autoclaved Aerated Concrete Production

Cautions:

1.Please turn off the power after work.

2.Please keep away when it is running.

Packing & Shipping:

Package conforms to the requirements of customs.

Inquiry Cart 0